Indonesia

[av_one_half first]
[av_heading tag=’h3′ padding=’10’ heading=’North Sulawesi Gold Mine’ color=” style=” custom_font=” size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]

[av_textblock ]
Contract: 2010 to present
Currently running 1x Hanjin P6000, 1x Thor 5000, 2x Hanjin P7000 Multipurpose, 1x Hanjin P4000 Multipurpose, 4X Furukawa HCR 1500.

Undertaking Exploration, Grade Control, Diamond drilling and Geotechnical drilling for pit modelling 24 hours per day, 7 days a week.

Equipment provided:

  • 1 x Hanjin P6000
  • 2 x Hanjin P7000
  • 1 x Hanjin P4000
  • 1 x Thor 5000
  • 4 x Furukawa HCR 1500
  • 1 x Furukawa DCR 20
  • 8 x Light Vehicles
  • 4 x Hanjin Crawler CR 10
  • 1 x Hanjin Crawler CR 7
  • 2 x Morooka Rubber Track
  • 2 x Buses
  • 4 x Tractors
  • 6 x Track mounted rod carriers
  • Lighting equipment
  • Genie Tele handler
  • Messing / Accommodation buildings off site
  • Workshop facility fitted out with all required tools and machinery

[/av_textblock]
[/av_one_half]

[av_one_half][/av_one_half]

[av_one_half first]

[av_heading heading=’South Sumatra Copper & Gold Mine’ tag=’h3′ color=” custom_font=” style=” size=” subheading_active=” subheading_size=’15’ padding=’10’][/av_heading]

[av_textblock]
Contract: from December 2009 to July 2011
Contract 5,000 meters with extensions
Contract: from May 2103 to Present
Diamond drilling Rc Pre collars.
RCGC Drilling.
Project was handled with one Hanjin 4000 and one Hanjin 7000. Drilled out the prospect in 20 months. Average of 1000 meters per month per rig over the whole project.
And now standby equipment on site waiting for new progress decision.

Equipment provided:

  • 1 x Hanjin P6000 Multipurpose drill
  • 1 x Hanjin Crawler CR 10
  • 1 x Morooka Rubber Track
  • 1 x 4 Wheel Drive Tractor
  • 1 x 350/9000 ELGI Compressor
  • Container workshop

[/av_textblock]

[/av_one_half][av_one_half][/av_one_half]

[av_one_half first]
[av_heading tag=’h3′ padding=’10’ heading=’NTT – Kupang Copper Mine’ color=” style=” custom_font=” size=” subheading_active=” subheading_size=’15’ custom_class=”][/av_heading]

[av_textblock ]
Contract: from July 2015 to present.

Diamond drilling. Project is equipped with 1 x Cortech CSD500C.

Equipment provided:

  • 1 x Cortech Rig CSD500C
  • 1 x 4 Wheel Drive Tractor
  • 1 x LV 4WD
  • Container workshop

[/av_textblock]
[/av_one_half]

[av_one_half][/av_one_half]