Central Kalimantan Coal Mining

Date: June 2012 to August 2013
Contract started with 1× Hanjin P7000 to undertake Air Core/Reverse Circulation drilling services.
The drilling program will involve a minimum of 30.000 meters of Air Core Drilling, average hole depths are planned to be at 150 meters with a maximum depth of 300 meters with core drilling at 60 – 90° inclination.

Equipment Provided:
Track Mounted Drill Rig x1
Track Crawler Mounted Compressor
Drill Pipe
Track/Truck Support Unit
4×4 Tractors
4×4 Personnel carrier
Tool Shed / Container